Skip to content

Glulam timber projects

Tie rods for glulam timber structures, including Woodchurch High School and Tottenham Court Road.

Daver Steels are involved in all aspects of the design, manufacture and supply of structural tie bars in glulam timber structures.

We work with architects, structural engineers and designers, civil engineering contractors, structural steel fabricators, installers and erectors.

The Daver tie bar system is available in carbon steel from M12 to M100, with yield loads of 44 kN to 3605 kN, and in stainless steel from M12 to M56, with yield loads of 44 kN to 1056 kN.

In addition to the standard range we have supplied specialist components and alternative arrangements to suit the requirements of individual designs.