- Architect
- Simon-Christiansen & Associés
- Structural Engineer
- Ingenieurgemeinschaft Härtel und Schiermeyer
- Steel Contractor
- Schmees & Lühn Holz- und Stahlingenieurbau GmbH
- Location
- Bereldange Footbridge, Walferdange
- Country
- Luxembourg
The cable stayed foot bridge spans the river Alzette and provides a link between two districts. The bridge is 100m long and 3.5m wide with a 30m span between 14.5m high pylons. The two main glulam beams are 20/90cm.
Daver Steels provided M48 stainless steel tendons for the deck hanger rods. The tendons are bright polished for effect and corrosion detailing.